MEINAN GAME
First grading
2006.2.23(Thu)

I started course production today. At the beginning, I measured form and dimensions of a course. And I was able to adapt myself to the dimensions that I cut materials (a pipe made in Japan) which were necessary for production and measured. I polished the pipe which I cut as the finish neatly.

2006.2.27(Mon)

I worked on I painted the pipe which I cut the other day today. Because Japan had only a black pipe, I worked on this to make it a white pipe. The painting took 3 hours and was very hard.

2006.2.28(Tue)

Because the painting was over, and a pipe was completed, I decided to try to assemble it today. It cut a long place on the way and added dimensions.

2006.3.3(Fri)

I started production of the accessory lamp which lighted up the course that I made the other day today. I used a white cosh this time from the beginning. It was hard to cut a cosh.

2006.3.14(Tue)

I let a machine recognize a goal today. However, I was not successful very much.

2006.3.15(Wed)

Two machines watched tentative completion and came to wait for a program afterward. I do not yet do a test with shapelessness either, but it is the first barrier passage if this moves. I want to try so hard that I am in time though time is running out.

2006.3.16(Thu)

The program is put and the start experiment will be done tomorrow.

2006.3.22(Wed)
I was able to do it in line trace of unit No.2.
2006.3.23(Thu)
I performed operation check of a machine chiefly today. The unit No. 2 came until completion close at hand.
2006.3.24(Fri)
I made two introduction pages today because two machines came until completion close at hand. In addition, I talked about a strategy.
About unit No. 1 "MARUPIN"
About unit No. 2 "SEKAI TURBINE"